Checks start with incoming steel and end with a loaded container: dimensions and welds, panel and interlock testing, an unloaded run, and a packing check against the list.
Every machine run before packingPanels tested at the benchRecords travel with the machine
01
Checkpoints
Four points where a line is checked
A fault is cheaper to fix at the checkpoint where it appears than in the container, or on your site.
01
Incoming material
Plates, tubes and bought-in parts are checked against the drawing and the mill certificate before they reach the saw.
02
Fabrication
Frames are checked for square after welding; shells for runout, wall thickness and weld appearance before assembly.
03
Machine test
Each machine runs unloaded: rotation, noise, vibration, belt tracking, seals, guards, interlocks and emergency stop.
04
Packing and loading
The load is counted against the packing list, then marked and photographed before the container doors close.
02
Measurements
What is measured, and how
The same checklist is used for a single machine and for a complete line; only the number of items changes.
Dimensions and squarenessTape and jigs against the general arrangement drawing; recorded on the inspection sheet.
Shell runout and wall thicknessMeasured on the roller bed before the drum goes into assembly.
Drive alignment and belt tensionChecked after the first run, then re-checked after the machine has warmed up.
Unloaded runDirection, noise, vibration and bearing temperature noted for every machine.
Panel and interlock testEvery button, sensor and emergency stop operated at the bench before the machine is powered.
Capacity trialWhere material is available, throughput and product appearance are recorded with the settings used.
Packing checkItem count, case numbers and lifting marks verified against the packing list.
03
Certificates & patents
Documents behind the nameplate
Scans of the management-system, conformity and patent documents, published as issued. Click any scan to open it at full size.
ISO 9001:2015Quality management system certificate for the manufacture of fertilizer processing equipment.CE — certificate of conformityIssued for the disc granulator (model TQZ-1000), tested to the LVD and EMC directives.Intertek PVoCPre-shipment verification of conformity for a consignment cleared into Kenya.
18 granted utility model patents cover machine details developed in house. Scans are published as issued; the current certificate set and the test report for your model are sent with the quotation on request.
04
Documents
What travels with the machine
Paper is part of the delivery: without it, a test cannot be repeated and a spare part cannot be ordered.
QC / factory test report with the measured values
Dated photos and video of the machine under test
Nameplate data, operation and maintenance manuals
Electrical drawings and the spare-parts list
Packing list, invoice and shipping documents
Warranty terms, with exclusions written down
Test records
Ask for the test report of your model
Tell us the machine or the line you are considering, and we will send the inspection sheet and the test record for that model — before you order.